 |
SoundScape in Progress / Cap installation
|
|
|
| Here the transition
piece is placed on the post which is anchored in concrete. The transition
piece will support the cable roof system which will in turn support
the square top frame which will later be bolted to the individual
instrument panels. |
FirstPageTemplate
|